Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,314㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 18 minutes walk from Funabashi Station! Newly built detached house in Natsumi 3-chome | Number of floors | floor (3floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 2LDK+2S (storage room) | Year of construction | 2026/3 | |||
| Structure | Three-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Evaluation / Construction Housing Performance Evaluation (new construction) / BELS/Energy Saving Standards Compliance Certificate / Flat 35-S Compliance Certificate / Energy Saving Measures / Flat 35S Compatible / Highly Airtight and Insulated Home / Soil Survey Completed / Access to 2 or More Train Lines / Supermarket Within 10 Minutes' Walk / System Kitchen / Bathroom Dryer / Good Sunlight / Storage in All Rooms / Flat to Station / Quiet Residential Area / LDK (Living, Dining, and Kitchen) Over 15 Tatami Mats / General Hospital Within 10 Minutes' Walk / Shower Vanity / Countertop Kitchen / Enhanced Security / 2 Toilets / Bathroom Over 3.3 m2 / Balconies on 2 or More Sides / Double-Glazed Glass / Auto Bath / Heated Washlet / Window in Bathroom / Intercom with TV Monitor / Good Ventilation / Flooring in All Rooms / 3 or More Floors / Staircase in Living Room / Double-Glazed Glass or Double-Glazed Windows in All Rooms / City Gas / All rooms have natural lighting from two sides / Flat ground / Water purifier / Smart key / Built-in garage / □■Ground Survey■□ We conduct ground surveys at all sites (Swedish sounding surveys). If the survey does not meet our standards, we will carry out ground improvement work. / □■Foundation Work■□ No high-performance home is worthless without a solid foundation. We not only conduct legal inspections, but also checks by construction supervisors and specialist staff. / □■Intermediate Inspection■□ An intermediate inspection is conducted once the roof is completed and construction of structural hardware, shear walls, waterproofing, etc. is complete. As with the foundation, legal inspections are conducted, and specialist staff and construction supervisors check the entire building. / ■Exterior Work■ After the exterior wall work is completed, the exterior work begins. We deliver the entire building, including the exterior work. / □■Exterior Wall Work■□ This is the exterior wall work. We use a dry, factory-produced cement board called siding, which is highly fire-resistant and durable. / □■Interior Construction■□ Now we are entering into the construction of the interior of the building. The walls and ceilings are made of a non-flammable material called gypsum board. | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
54,800,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/19 | |||
| Important Notices | Restrictions apply under the Landscape Act |
|||||
|
|
||||||


