Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,314㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | ~*Completed and available for viewing on the same day◎12 minute walk to elementary school, so your children can go to school safely♪*~◆6-chome Shibayama, Funabashi City◆ | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/12 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Suitable for Flat 35S / Immediate Delivery / Close to City Center / System Kitchen / Bathroom Dryer / Good Sunlight / Storage in All Rooms / Quiet Residential Area / LDK (Living, Dining, and Kitchen) 15+ Tatami Mats / Vanity with Shower / Countertop Kitchen / Barrier-Free / Two Toilets / Bathroom 1 Tsubo (3.3 m2) or Larger / Two-Story / South-Facing Balcony / Double-Glazed Glass / Auto Bath / Heated Toilet Seat / Underfloor Storage / Window in Bathroom / Intercom with TV Monitor / Near Urban Area / Good Ventilation / Flooring in All Rooms / Double-Glazed Glass or Double-Glazed Windows in All Rooms / City Gas / Unit rebar and other materials are placed on top of concrete and crushed stone in designated positions, and wire called binding wire is secured with a tool called a 'hakka' (burlap ties). These wires are used to connect the concrete and strengthen the foundation. After the rebar is assembled, the ready-mix concrete is poured and smoothed using a laser level, drill bit, and trowel. Pouring ready-mixed concrete into the foundation construction area helps prevent moisture buildup. / The base is placed on top of the foundation, and then the pillars and other framework are erected on top of that. It's important to consider the order in which they are assembled to ensure a balanced structure. After checking that the pillars are vertical and the beams are horizontal and free of distortion, the roof framework is constructed, completing the house's structure. / To protect the structure, the interior is finished using materials that are not only stylish but also water-resistant, fire-resistant, and corrosion-resistant. Floors are laid over the base boards with flooring, tatami, or carpet, and the interior walls and ceilings are finished to suit either Japanese or Western-style rooms. / This work begins after the floor and wall framework is complete. To protect the house from rain, wind, fire, and heat, a waterproof layer is installed on the exterior wall baseboards and then flame-resistant materials are applied. Further finishing touches are applied, such as mortar or metal panels. / Finishing touches are then applied to the kitchen, bathroom, toilet, washbasin, and other plumbing, as well as windows, storage fixtures, and other fixtures. | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
39,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/22 | |||
| Important Notices | ||||||
|
|
||||||


