Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,314㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | Blooming Garden, Minoridai 1-chome, Matsudo City, Building 1 | Number of floors | floor (floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2025/12 | |||
| Structure | Format | Newly built detached house | ||||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Evaluation / Construction Housing Performance Evaluation (new construction) / BELS/Energy Saving Standards Compliance Certificate / Highly airtight and insulated home / Parking available for 2 cars / Access to more than 2 train lines / LDK over 20 tatami mats / Energy-saving water heater / Supermarket within 10 minutes' walk / South facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / South-facing road / Corner lot / Regular lot / Garden / Vanity with shower / Countertop kitchen / 2 toilets / Bathroom over 3.3 sq. m / 2-story / South-facing balcony / Double-glazed toilet seat / Underfloor storage / Intercom with TV monitor / Water-saving toilet / Pantry (storage for dishes and food) / Walk-in closet / Double-glazed or double-glazed sash in all rooms / City gas / Elementary school within 10 minutes' walk / Two-family home / Water purifier / Smart key / [Blooming Garden, Building 1, Minoridai 1-chome, Matsudo City] Energy-saving performance label This label does not indicate the performance of a specific unit. | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
54,800,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/25 | |||
| Important Notices | [Other laws] Residential Land Development Control Act, Landscape Act [Notes] Parking spaces may not be available depending on the vehicle type. Furthermore, parking in areas that do not have a concrete floor may damage underground pipes, requiring additional concrete construction. The buyer will be responsible for the construction costs. *There may be errors in the information provided. Please have each contractor investigate this before making any inquiries. We do not take any responsibility. |
|||||
|
|
||||||


