Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,434㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 45.6 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2024/5 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Design housing performance evaluation report / Construction housing performance evaluation report (new construction) / Building confirmation completion inspection certificate / Flat 35-S compliance certificate / Flat 35S compatible / 2 parking spaces available / Immediate delivery / LDK over 20 tatami mats / Land over 165 sq. m / Close to urban area / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Shaped lot / Garden / Vanity with shower / Countertop kitchen / Barrier-free / 2 toilets / Bathroom over 3.3 sq. m / 2-story / Southeast facing / South-facing balcony / Heated toilet seat / Underfloor storage / Intercom with TV monitor / Urban area / Good ventilation / Flooring in all rooms / Good views / Stairs in living room / City gas / Flat ground / Land readjusted / Storage room / Dishwasher / Low traffic in the area / Large distance between neighboring houses / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
45,600,000 Yen |
|||||
| Information publication date | 2026/3/2 | Next update date | 2026/2/8 | |||
| Important Notices | Restrictions apply under the Landscape Act, Aviation Act, Urban Renewal Special District, Agricultural Land Act, height limit 10m. *Temporary replacement land within the Kaneda Nishi Specific Land Readjustment Project, Kisarazu City Kisarazu Urban Planning Project. *As this is prior to the land replacement disposition, the land area may fluctuate slightly. After the land replacement disposition is announced, a settlement fee may be collected or paid. |
|||||
|
|
||||||

