Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,268㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 36.8 million yen (4LDK) | Number of floors | floor (floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2026/3 | |||
| Structure | Format | Newly built detached house | ||||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Evaluation Report / Construction Housing Performance Evaluation Report (new construction) / Flat 35-S Compliance Certificate / Soil Survey Completed / Parking for 2 cars / Access to 2 or more train lines / LDK 18 tatami mats or larger / Energy-saving water heater / Supermarket within 10 minutes' walk / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / South-facing road / Frontage road 6m or larger / Regular lot / Garden / Vanity with shower / Countertop kitchen / 2 toilets / Bathroom 1 tsubo or larger / 2-story building / Double-glazed windows / South-facing rooms / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Flooring in all rooms / Walk-in closet / Double-glazed windows or double-glazed windows in all rooms / City gas / Elementary school within 10 minutes' walk / Dishwasher / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
36,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/25 | |||
| Important Notices | [Other laws and regulations] Article 22 Zoning, Landscape Act, Residential Land Development and Specific Fill Regulation Act *Parking in areas that do not have a concrete floor may damage underground pipes, etc., and additional concrete floor construction is required. The construction costs will be borne by the buyer. |
|||||
|
|
||||||


