Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,330㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | Dainichi, Yotsukaido City Detached house | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2025/7 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-term excellent housing certification notice / Design housing performance evaluation report / Construction housing performance evaluation report (new construction) / Flat 35-S compliance certificate / Soil survey completed / Delivery within the year / Parking for 2 cars / LDK over 20 tatami mats / Close to city center / South facing / System kitchen / Good sunlight / Storage in all rooms / South facing road / Frontage road over 6m / Corner lot / Counter-style kitchen / Wide balcony / 2 toilets / Bathroom over 1 tsubo (3.3 m2) / 2-story / Underfloor storage / Window in bathroom / Void ceiling / Good ventilation / Pantry (storage for dishes and food) / Walk-in closet / City gas / Shoe closet / Light coming in from two sides in all rooms / Dishwasher/dryer / Intercom with TV monitor to identify visitors. / Bathroom dryer / Made of solid cypress wood / Strong foundation with high earthquake resistance / Durability is maintained with measures to prevent deterioration / Achieves excellent earthquake resistance and an open space / High-performance glass wool with excellent economical performance / Highly insulated for a comfortable life | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
42,600,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/25 | |||
| Important Notices | Altitude area, Article 22 area of the Act |
|||||
|
|
||||||

