Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,314㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 57,990,000 yen (4LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2026/3 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Energy-saving measures / Compatible with Flat 35S / Soil survey completed / Access to two or more train lines / LDK over 20 tatami mats / Energy-saving water heater / Supermarket within 10 minutes' walk / Close to city center / South-facing / System kitchen / Good sunlight / Storage space in all rooms / Quiet residential area / Front road over 6m / Corner lot / Garden / Vanity with shower / Countertop kitchen / Enhanced security / Barrier-free / Two toilets / Bathroom over 3.3 m2 / Two-story / Balconies on two or more sides / South-facing balcony / Double-glazed flooring / Auto-bath / Heated toilet seat / Southern garden / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Lush residential area / Urban suburbs / Good ventilation / Flooring in all rooms / Great views / Double-glazed or double-glazed windows in all rooms / City gas / Natural lighting in all rooms / Elementary school Within 10 minutes' walk / Dishwasher / Low traffic volume in the area / Water purifier / High-performance toilet | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
57,990,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/19 | |||
| Important Notices | Residential land development construction restriction area, height district, Article 22 area, City Planning Act Article 53 area, Type 1 height district, sewerage treatment area, corner lot relaxation, building coverage ratio/70%・60% |
|||||
|
|
||||||


