Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 996㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 43.8 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2025/11 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Evaluation / BELS/Energy Saving Standards Compliance Certificate / Energy-Saving Measures / Soil Survey Completed / Parking for 2 Cars / Lot Over 165m2 / Energy-Saving Water Heater / Supermarket Within 10 Minutes' Walk / System Kitchen / Bathroom Dryer / Storage Space in All Rooms / LDK Over 15 Tatami Mats / Front Road Over 6m / Shaped Lot / Vanity with Shower / Countertop Kitchen / Lighting from 3 Sides / 2 Toilets / Bathroom Over 3.3m2 / 2-Story / Southeast Facing / South-Facing Balcony / Double-Glazed Glass / Auto Bath / Heated Washlet / Underfloor Storage / Window in Bathroom / Open Ceiling Light / Intercom with TV Monitor / Water-Saving Toilet / Pantry (Storage for Dishes and Food) / Double-Glazed Glass or Double-Glazed Windows in All Rooms / City Gas / Shoe Closet / Located in a Subdivision / Dishwasher / Water Purifier / Smart Key | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
43,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/21 | |||
| Important Notices | Restricted by the Landscape Act, [Urban Planning Road] To the north there is the 14.0m wide "3-5-55 Kamekubo Chuo Line", but it has been developed. [Other Laws] Buried cultural property ⇒ Outside the area, but notification is required *The park and development road have been adopted by the city (there is a fire water tank in the park) ●Other interests/Yes (Garbage dump ⇒ (1) 7.03m2 (2) 6.72m2, 1/55 each *Box to be installed, unused land 6.81m2, 1/55 each) 1/1 of the 53.84m2 of the agreed road *Separate registration costs will be incurred due to the establishment of an easement. *Land area includes 53.84m2 of agreed road |
|||||
|
|
||||||


