Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 996㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 42.8 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2025/11 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Designed Housing Performance Evaluation / BELS/Energy Saving Standards Compliance Certificate / Energy-Saving Measures / Ground Survey Completed / Parking for 2 Cars / Energy-Saving Water Heater / Supermarket Within 10 Minutes' Walk / System Kitchen / Bathroom Dryer / Storage Space in All Rooms / LDK (Living, Dining, and Kitchen) Over 15 Tatami Mats / Frontage Road Over 6 Meters / Shaped Lot / Vanity with Shower / Countertop Kitchen / Wide Balcony / Lighting on 3 Sides / 2 Toilets / Bathroom Over 3.3 m2 / 2-Story / Southeast Facing / Double-Glazed Glass / Auto Bath / Heated Toilet Seat / Underfloor Storage / Window in Bathroom / Intercom with TV Monitor / Water-Saving Toilet / Walk-In Closet / Double-Glazed Glass or Double-Glazed Windows in All Rooms / City Gas / Located in a Subdivision / Dishwasher / Water Purifier / Smart Key | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
42,800,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/21 | |||
| Important Notices | Restricted by the Landscape Act. [Urban Planning Road] To the north is the 3-5-55 Kamekubo Chuo Line, 14.0m wide, but has been developed. [Other Laws] Buried cultural property -> Outside the area, but notification required *The park and development road have been adopted by the city (there is a fire-fighting water tank in the park). ●Other interests/Yes (Garbage dump -> (1) 7.03m2 (2) 6.72m2, 1/55 each *Box to be installed, unused land 6.81m2, 1/55 each) ●An easement will be established for the private road interest as it is an agreed road. Separate costs will be incurred for establishing the easement. ●The land area includes 33.07m2 of agreed road ●The building area includes 2.69m2 of garage space. |
|||||
|
|
||||||


