Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,063㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | GRAFARE Kami, Konosu City Newly built house | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/10 | |||
| Structure | Two-story wooden building (frame construction) | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Evaluation Report / Construction Housing Performance Evaluation Report (new construction) / Energy-saving measures / Compatible with Flat 35S / 2 parking spaces available / Immediate delivery available / Energy-saving water heater / Close to city center / System kitchen / Bathroom dryer / Storage space in all rooms / LDK (living, dining, dining, and kitchen) over 15 tatami mats / Front road over 6m / Japanese-style room / Garden / Face-to-face kitchen / Wide balcony / 2 toilets / Bathroom over 3.3 sq. m / 2-story / Southeast facing / South-facing balcony / Double-glazed windows / Auto bath / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Good ventilation / Walk-in closet / City gas / Shoe storage / Flat ground / Water purifier / Scratch-resistant artificial marble worktop / Vanity with three-way mirror / Ventilation/dryer/heater and bathtub with bench / Toilet with heated toilet seat We thoroughly inspect the soil based on three categories and eight elements, in accordance with legal requirements. We provide foundation specifications and ground improvement work tailored to the land conditions. We guarantee the quality of the soil, preventing uneven settlement. We offer a 10-year warranty, starting from the foundation construction start date and continuing until the date of delivery. / Foundation subsidence and leaks are the most troublesome problems in homes. Our trusted inspectors conduct two on-site inspections, covering the soil investigation, ground improvement, and structural inspection. / We use a "pre-cut system" for the majority of our structural wood, reducing costs, shortening construction time, and ensuring consistent quality. This construction method minimizes waste and is environmentally friendly, both for residents and the planet. / We use building materials that meet the highest safety standards, equivalent to F☆☆☆☆. We use healthy, zero-formaldehyde wallpaper adhesives and are committed to using materials that contain virtually no harmful substances. / The firmly fixed structural frame works together to improve seismic resistance and durability, protecting the home from external forces such as earthquakes. This makes the home earthquake-resistant. This construction method combines the design freedom of wooden frame construction with the high earthquake resistance of structural plywood panel construction. The exterior walls, first and second floor floor framing, and roof are all integrated with structural plywood, achieving high earthquake resistance. | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
34,900,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/20 | |||
| Important Notices | Restrictions apply under the Landscape Act |
|||||
|
|
||||||

