Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 996㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 4798万円~5198万円(3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2025/7 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Design housing performance evaluation report / Construction housing performance evaluation report (new construction) / Compatible with Flat 35S / Soil survey completed / Delivery within the year / Parking for two cars / Supermarket within 10 minutes' walk / Close to city center / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Flat to station / Quiet residential area / LDK (living, dining, dining, and kitchen) over 15 tatami mats / Regular lot / Vanity with shower / Countertop kitchen / Wide balcony / Barrier-free / Two toilets / Bathroom over 3.3 sq. m / Two-story / South-facing balcony / Double-glazed bathroom / Auto-bath / Heated toilet seat / Underfloor storage / Window in bathroom / Open ceiling space / Intercom with TV monitor / Water-saving toilet / Lush residential area / Good ventilation / Flooring in all rooms / Pantry (storage for dishes and food) / Walk-in closet / Double-glazed or double-glazed windows in all rooms / City gas / All rooms have two-sided lighting / Flat ground / Dishwasher / Water purifier / High-performance toilet | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
47,980,000 Yen |
|||||
| Information publication date | 2025/11/11 | Next update date | 2025/11/7 | |||
| Important Notices | Restrictions apply under the Landscape Act. The garbage dump is 2.51% owned, with each owner taking 1/5 of the total. Regarding the agreed passageway, the owners of buildings (1), (2), and (3) will be required to mutually establish a right-of-way easement (at the buyer's expense). |
|||||
|
|
||||||


