Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 996㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 31.9 million yen to 40.9 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2026/3 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Assessment / Construction Housing Performance Assessment (new construction) / BELS/Energy Saving Standards Compliance Certificate / Flat 35S compliant / Solar power generation system / Parking available for 2 cars / LDK (over 20 tatami mats) / LDK (over 18 tatami mats) / Energy-saving water heater / System kitchen / Bathroom dryer / Good sunlight / Storage in all rooms / South-facing road / Quiet residential area / LDK (over 15 tatami mats) / Corner lot / Regular lot / Vanity with shower / Countertop kitchen / Wide balcony / 2 toilets / Bathroom over 3.3 sq. m / 2-story / Balconies on 2 or more sides / South-facing balcony / All rooms face south / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Good ventilation / Flooring in all rooms / Pantry (storage for dishes and food) / Walk-in closet / All rooms have double-glazed glass or double-glazed sashes / City gas / Shoe closet / All rooms have lighting from two sides / Elementary school within 10 minutes' walk / Dishwasher / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
31,900,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/16 | |||
| Important Notices | Cleaning facility share: 2.50m2 x 1/6 Agreement road: Building 1 8.45m2, Building 2 13.50m2, Building 3 3.0m2, Building 6 7.16m2 (included in site area) |
|||||
|
|
||||||


