Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 996㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 46.8 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2025/11 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-term Excellent Housing Certification Notice / Designed Housing Performance Assessment / BELS/Energy Saving Standards Compliance Certificate / Energy-saving measures / Soil survey completed / Parking for 2 cars / LDK (living, dining, and kitchen) over 18 tatami mats / Energy-saving water heater / Supermarket within 10 minutes' walk / System kitchen / Bathroom dryer / Storage in all rooms / LDK (living, dining, and kitchen) over 15 tatami mats / Front road over 6m / Regular lot / Vanity with shower / Counter-style kitchen / Lighting from 3 sides / 2 toilets / Bathroom over 1 tsubo (3.3 m2) / 2-story / Southeast facing / South-facing balcony / Double-glazed windows / Auto-bath / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Double-glazed windows or double-glazed windows in all rooms / City gas / Shoe closet / Located in a developed subdivision / Dishwasher / Water purifier / Smart key | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
46,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/21 | |||
| Important Notices | Restricted by the Landscape Act. [Urban Planning Road] To the north is the 14.0m wide "3-5-55 Kamekubo Chuo Line", which has been developed. [Other Laws] Buried cultural property -> Outside the area, but notification required. *The park and development road have been transferred to the city (there is a fire-fighting water tank in the park). ●Other interests: Yes (Garbage dump -> (1) 7.03m2 (2) 6.72m2, 1/55 each. *Box installation planned. Unused land 6.81m2, 1/55 each.) |
|||||
|
|
||||||


