Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,101㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | Negishi 1-chome, Sayama City | Sumstock | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2006/6 | |||
| Structure | Two-story wooden building | Format | Used detached house | |||
| Equipment | Defect insurance (designated by the Ministry of Land, Infrastructure, Transport and Tourism) available / Defect insurance (designated by the Ministry of Land, Infrastructure, Transport and Tourism) guaranteed / Flat 35-S compliance certificate / Parking for 3 or more cars / Energy-saving water heater / Close to city center / South-facing / System kitchen / Bathroom dryer / Frontage road over 6m / Corner lot / Japanese-style room / Garden over 10 tsubo (33.3 m2) / Garden / Countertop kitchen / EV charging facility / Barrier-free / 2 toilets / 2-story / South-facing balcony / Heated toilet seat / Window in bathroom / Intercom with TV monitor / Pantry (storage for dishes and food) / Walk-in closet / All rooms over 6 tatami mats (6 tatami mats) in size / IH cooking heater / Roof balcony / Flat ground / Low traffic in the area / All-electric | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
33,100,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/18 | |||
| Important Notices | There are restrictions under the Landscape Act, and shadow restrictions. *Landscape Act*As it is a corner lot, the building coverage ratio will be relaxed from 60% to 70%. *Facilities: Gas/all-electric, drinking water/public water supply, wastewater/miscellaneous drainage/public sewer *As this is an all-electric home, no gas is used. *Seller designated by a judicial scrivener *Confirmed surveying has been carried out *The property will be handed over after construction of boundary blocks (south and east neighboring land boundaries) on the property. (Construction is scheduled to be completed at the end of October 2024) *School permission is required for commuting to junior high school by bicycle. |
|||||
|
|
||||||


