Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,028㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | Musashino 2, Fukaya City, all 3 buildings, Cradle Garden | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK to 4LDK+S (storage room) | Year of construction | 2025/9 | |||
| Structure | Two-story wooden building (frame construction) | Format | Newly built detached house | |||
| Equipment | Design housing performance evaluation report / Construction housing performance evaluation report (when built) / Flat 35-S compliance certificate / Compatible with Flat 35S / Soil survey completed / Parking for 3 or more cars / Immediate delivery available / Land area of 165m2 or more / System kitchen / Bathroom dryer / Good sunlight / Storage in all rooms / South-facing road / Quiet residential area / LDK of 15 tatami mats or more / Japanese-style room / Regular land / Garden / Vanity with shower / Wide balcony / 2 toilets / Bathroom of 3.3m2 or more / South-facing balcony / Double-glazed glass / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / No front ridge / Walk-in closet / Double-glazed glass or double-glazed sashes in all rooms / Storeroom / "QUIE" is a prefabricated home brand that combines earthquake resistance to withstand earthquake shaking and seismic control performance to reduce shaking and damage to the home. Protect your home with two safeguards, forged to withstand a magnitude 7 earthquake. / Our housing performance evaluation is objectively conducted by a third-party organization. We have achieved the highest rating in eight categories across five areas of the Housing Performance Rating System, providing peace of mind. / To build a stronger foundation, we use a "slab foundation" construction method that transfers the building's load to the ground. We construct the foundation with a floor area equal to the superstructure. / Pre-cut materials, which are superior in preventing processing errors and reducing labor, are used not only for structural materials (columns, beams, etc.) but also for bracing materials (bracing, partitions, etc.). / We primarily use glass wool insulation for wall insulation. In addition, inspection staff conducts confirmation inspections on all buildings. / Our SAFE365 vibration control device utilizes a viscoelastic material. This material is also used in the vibration control device of the Concept Building, providing excellent seismic energy absorption (reducing a magnitude 6+ earthquake by up to 67%). | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
16,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/20 | |||
| Important Notices | Restrictions apply under the Landscape Act |
|||||
|
|
||||||

