Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 996㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 45.8 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2025/11 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Designed Housing Performance Evaluation / BELS/Energy Saving Standards Compliance Certificate / Energy-Saving Measures / Ground Survey Completed / Parking for 2 Cars / Energy-Saving Water Heater / Supermarket Within 10 Minutes' Walk / System Kitchen / Bathroom Dryer / Storage Space in All Rooms / LDK (Living, Dining, and Kitchen) Over 15 Tatami Mats / Frontage Road Over 6 Meters / Regular Lot / Vanity with Shower / Countertop Kitchen / Wide Balcony / Lighting from 3 Sides / 2 Toilets / Bathroom Over 3.3 m2 / 2-Story / Southeast Facing / Double-Glazed Glass / Auto Bath / Heated Toilet Seat / Underfloor Storage / Window in Bathroom / Intercom with TV Monitor / Water-Saving Toilet / Double-Glazed Glass or Double-Glazed Windows in All Rooms / City Gas / Located in a Subdivision / Dishwasher / Water Purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
45,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/21 | |||
| Important Notices | Restricted by the Landscape Act. [Urban Planning Road] To the north there is the 3-5-55 Kamekubo Chuo Line, 14.0m wide, but it has been developed. [Other Laws] Buried cultural property -> Outside the area, but notification is required *The park and development road have been adopted by the city (there is a fire water tank in the park). ●Other interests/Yes (Garbage dump -> (1) 7.03m2 (2) 6.72m2, 1/55 each *Box to be installed, unused land 6.81m2, 1/55 each) ●An easement will be established for the private road interest as it is an agreement road. Separate costs will be incurred for establishing the easement. ●Land area includes 0.25m2 of agreement road |
|||||
|
|
||||||

