Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,101㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 31.8 million yen (4LDK) | Number of floors | floor (floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | Year of construction | / | ||||
| Structure | Format | Newly built detached house | ||||
| Equipment | Design housing performance evaluation report / Construction housing performance evaluation report (new construction) / Compatible with Flat 35S / Soil survey completed / 2 parking spaces available / Access to two or more train lines / Delivery within the fiscal year / Energy-saving water heater / Supermarket within 10 minutes' walk / Close to city center / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Flat to station / Quiet residential area / LDK (living, dining, and kitchen) over 15 tatami mats / Front road over 6m / Starting station / Regular lot / Garden / Vanity with shower / Countertop kitchen / Wide balcony / Two toilets / Bathroom over 3.3 sq. m / 2-story building / Balconies on two or more sides / South-facing balcony / Double-glazed glass / All rooms face south / Auto-bath / South-facing garden / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Lush residential area / Urban suburbs / Good ventilation / Flooring in all rooms / Walk-in closet / Double-glazed or double-glazed windows in all rooms / Two-sided lighting in all rooms / Elementary school within 10 minutes' walk / Flat ground / Redeveloped land / Movable partition / Low traffic in the surrounding area / Water purifier / Smart key | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent | ||||||
| Information publication date | 2026/1/15 | Next update date | ||||
| Important Notices | ||||||
|
|
||||||


