Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,101㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 29.9 million yen (4LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/5 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Design housing performance evaluation certificate / Construction housing performance evaluation certificate (new construction) / BELS/Energy saving standard compliance certificate / Flat 35-S compliance certificate / Energy saving measures / Ground survey completed / Delivery within the year / 2 parking spaces available / Immediate delivery available / Delivery within the year / Energy saving water heater / Supermarket within 10 minutes' walk / System kitchen / Storage space in all rooms / LDK over 15 tatami mats / Corner lot / Vanity with shower / Countertop kitchen / 2 toilets / Bathroom over 3.3 sq. m / 2-story / Southeast facing / Double glazing / Auto bath / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Walk-in closet / Stairs in living room / Double glazing or double sash in all rooms / City gas / Large distance from neighboring houses | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
29,900,000 Yen |
|||||
| Information publication date | 2025/11/11 | Next update date | 2025/11/10 | |||
| Important Notices | Restrictions apply under the Landscape Act, Aviation Act, and shadow restrictions. [Other restrictions] Land use: Partial public road. Floor area ratio: Front road width restriction. Building coverage ratio: Corner lot relaxation. Article 22 area. Shadow restrictions: 4h-2.5h/4m. Excavation permission granted. |
|||||
|
|
||||||

