Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 996㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 45.8 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2025/11 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Evaluation / BELS/Energy Saving Standards Compliance Certificate / Energy Saving Measures / Soil Survey Completed / Parking for 2 Cars / Land Over 165m2 / LDK Over 18 Tatami Mats / Energy Saving Water Heater / Supermarket Within 10 Minutes' Walk / System Kitchen / Bathroom Dryer / Storage in All Rooms / LDK Over 15 Tatami Mats / Frontage Road Over 6m / Vanity with Shower / Countertop Kitchen / Wide Balcony / Lighting on 3 Sides / 2 Toilets / Bathroom Over 3.3m2 / 2-Story / Southeast Facing / Double Glazing / Auto Bath / Heated Washlet / Underfloor Storage / Window in Bathroom / Intercom with TV Monitor / Water-Saving Toilet / Double Glazing or Double Glazing in All Rooms / City Gas / Located in a Subdivision / Dishwasher / Water Purifier / Smart Key | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
45,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/21 | |||
| Important Notices | Restricted by the Landscape Act. [Urban Planning Road] To the north there is the 3-5-55 Kamekubo Chuo Line, 14.0m wide, but it has been developed. [Other Laws] Buried cultural property -> Outside the area, but notification is required. *The park and development road have been adopted by the city (there is a fire-fighting water tank in the park). ●Other interests/Yes (Garbage dump -> (1) 7.03m2 (2) 6.72m2, 1/55 each *Box to be installed, unused land 6.81m2, 1/55 each). ●An easement will be established for the private road interest as it is an agreed road. Separate costs will be incurred for establishing the easement. ●Land area includes 45.60m2 of agreed road. |
|||||
|
|
||||||

