Newly built condominiums in Hatanaka 2-chome, Niiza City, total of 3 buildings Search property information for sale

Houses for sale HouseServiceCompany

Newly built condominiums in Hatanaka 2-chome, Niiza City, total of 3 buildings

Price 29,900,000 Yen
Common service fee/management fee
Parking none
Security deposit (security deposit)-(-)
Key money (shikihiki)-(-)
Floor plan3LDK
Livable space93.61m²
Year of construction 10/2025 (new construction)
Building floor number/orientation / -
Traffic
  • Tobu Tojo Line Asakadai Station : 2 minutes on foot
  • Tobu Tojo Line Asaka Station : 39 minutes on foot
  • Niiza Station on the JR Musashino Line : 36 minutes on foot
AddressHatanaka 2, Niiza City, Saitama Prefecture

Facilities: Tokyo Electric Power Company, public water supply, main sewerage, city gas, Building confirmation number: No. 24UDI1W08434

  • Floor plan

Check information around the property

※The pink line shows the route from the property to the selected icon.

※Google APIDisplays the distance and walking minutes from the property to the facility.

Precipitation amount at property location: 1,296㎜/ Year

National average precipitation: 1,590㎜/ Year

Lifeline information such as surrounding shops and facilities

■Property details information

Property name Newly built condominiums in Hatanaka 2-chome, Niiza City, total of 3 buildings Number of floors floor (floors)
Floor plan 3LDK Year of construction 2025/10
Structure Format Newly built detached house
Equipment Design housing performance evaluation certificate / Construction housing performance evaluation certificate (new construction) / Compatible with Flat 35S / Soil survey completed / Delivery within the year / 2 parking spaces available / Access to 2 or more train lines / Energy-saving water heater / Supermarket within 10 minutes' walk / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / LDK (living, dining, and kitchen) over 15 tatami mats / Front road over 6m / Vanity with shower / Counter-style kitchen / Barrier-free / 2 toilets / Bathroom over 3.3 sq. m / 2-story / Double-glazed / Heated toilet seat / Underfloor storage / Intercom with TV monitor / Water-saving toilet / Urban area / Good ventilation / Flooring in all rooms / Southwest facing / City gas / Flat ground / Water purifier / 24-hour ventilation / Low-E glass / Intercom with TV monitor / 2 car spaces (depending on vehicle type) / Slab foundation / Structural plywood / By incorporating seismic control devices, we have also succeeded in reducing the cost of seismically controlled housing. Our housing brand, "QUIE," combines "seismic resistance" to withstand earthquake tremors with "seismic control" to suppress tremors and reduce damage to the home. These two measures protect our customers' homes. / By incorporating seismic control devices, we have also succeeded in reducing the cost of seismically controlled housing. Our housing brand, "QUIE," combines "seismic resistance" to withstand earthquake tremors with "seismic control" to suppress tremors and reduce damage to the home. These two measures protect our customers' homes. / By increasing the width of the rising part of the foundation by 30 mm, we create a stronger foundation that can withstand the vertical forces (shear forces) acting on the foundation. The Building Standards Act standard is approximately 120 mm. Our company's standard is 150 mm (both perimeter and interior). We use 16 mm rebar for the main reinforcement of the foundation of every unit. While 13mm rebar is commonly used in the construction of slab foundations for standard wooden houses, we voluntarily adopt 16mm rebar as the main reinforcement for all foundations. Strength comparison tests using 16mm rebar have shown that the strength of foundations with reinforcement arrangements stipulated by the Building Standards Act is significantly higher. Hold-down hardware (or pull-down hardware) is a type of reinforcing hardware primarily used in wooden frame construction. These hardware are essential for preventing columns from dislodging from the foundation or beams during earthquakes or typhoons. They are attached to both the base (the bottom of the column) and the capital (the top of the column). Glass wool insulation's effectiveness is reduced if it is not applied properly. Condensation can sometimes damage the home. Therefore, we encourage our employees and craftsmen to obtain Meister certification from the Glass Fiber Association. At the same time, we are also researching the ease of application of insulation materials themselves, developing and implementing insulation materials that are easy to apply neatly and building installation techniques.
Scheduled move-in date Insurance
Estimated rent

29,900,000 Yen

Information publication date 2026/1/16 Next update date 2026/1/17
Important Notices

■Search from the same area/route/station

Nearest station line
Nearest station
Same city/ward/town/village

Inquiry regarding this propertyPlease enter the required information

Inquiry details Required
Desired move-in period Required
Given name Required

First and last name

Furigana

Contact information Required

Preferred contact method

Telephone number

Email

Regarding handling of personal information held by us